Background
Company desired
the automatization of the planning and production programming
system
Invited us to
help, discovering the physical process was complex
Our first
recommendation was to simplify the process then follow on
automatization
Project consisted
in the simplification of processes, design and improvement of the
information system
Structure
Inventory
Policy
What needs to be in stock
How to identify stockable products
How to take into account seasonality
Planning
Architecture
Visual floor control
Knowledge architecture utilizing Minimalist Theory
Order assignment algorithm between plants
Programming algorithm
Rapid Response
Assure a rapid response through a rapid change program
Remove process inventory cutting response time
Results
Reduction in
delivery time inside the plant from 5 to 1.2 days for each roll
Service level
improvement from 60% to 85% between 0 and 5 days
Inventory
rotation from 12 to 42 rounds
Weekly
programming time from 2 to 0.5 days